Leveraging the Gap: Improving Project Delivery Through Off-Site Manufacturing

Submitted by isabellarosse@… on Tue, 04/11/2023 - 18:28
Start Date
End Date
Venue Name
AIAU
Register URL
https://aiau.aia.org/courses/leveraging-gap-improving-project-delivery-through-site-manufacturing
LU Credit
1.00
Host
Academy of Architecture for Health (AAH)
Overview
{"version":"0.3.0","atoms":[],"cards":[],"markups":[["strong"]],"sections":[[1,"p",[[0,[],0,"As\n the demand for skilled labor continues to rise and our existing \nworkforce nears retirement, the need for innovation in our industry \nbecomes increasingly crucial. To address this challenge, off-site \nmanufacturing has emerged as a promising solution to increase \nproductivity while minimizing labor requirements, creating a safer and \nhigher-quality work environment, and ensuring timely project delivery to\n meet the demands of our clients. However, successful implementation of \noff-site manufacturing requires strategic planning and careful \nconsideration of timing. \n\n"]]],[1,"p",[[0,[],0,"\n "]]],[1,"p",[[0,[0],1,"Learning objectives "]]],[3,"ul",[[[0,[],0,"Identify the key factors to consider when utilizing off-site\n manufacturing and how these can improve staff and patient safety by \nminimizing disruptions on active campuses. \n"]],[[0,[],0,"Identify what types of items lend themselves to be manufactured \noff-site, what has been done before, and how high-quality patient safety\n can be achieved through repeatable manufacturing process and enhanced \nproduct quality, including items such as: restroom pods (healthcare, \ndormitories, hotels), medical headwalls and footwalls, exterior skin \npanels, packaged central plants and penthouses, MEP racks, and \nelevators."]],[[0,[],0,"Identify how decisions associated with off-site manufacturing \ninfluence the end-user and patient experiences and how the repeatable \nnature of modular construction yields identical components that create a\n consistent environment for caregivers, which in turn enhances patient \nsafety and improves overall care quality. "]],[[0,[],0,"\nIdentify constraints to off-site manufacturing, including factors \nsuch as shipping constraints, timing of decisions- constraint analysis, \naccess and loading into the building, timing of loading the building, \nand delivery inside the building.\n"]]]]]}
Speakers
{"version":"0.3.0","atoms":[],"cards":[],"markups":[],"sections":[[1,"h3",[[0,[],0,"\n Billie Graham, LEED AP \n \n \n \n \n \n \n \n\n \n"]]],[1,"p",[[0,[],0,"For\n over 15 years, Billie Graham has delivered healthcare projects as a \ndesigner, builder, subcontractor, and owner\u2019s rep. This has provided a \nunique perspective from which to drive innovation in projects. During \nhis 13 years at The Beck Group, he lead integrated teams of designers \nand builders to execute projects ranging from equipment replacements, to\n new patient towers, to system master plans. While there, Billie helped \nto establish a prefabrication subsidiary, focused on manufacturing and \ndelivering prefabricated components like, bathroom pods, headwalls, and \nelevators. Billie recently joined the team at Myers \u0026 Chapman, a\n Charlotte-based general contractor, to help drive the strategy and \ngrowth for their healthcare sector.\n\n "]]]]}
Event Type
Description
Identify the key factors to consider when utilizing off-site manufacturing and how these can improve staff and patient safety by minimizing disruptions on active campuses.
Members Only
Off
Deleted
Off
Tile Sizes
Use on Homepage
Off
SEO Keywords
healthcare, design, project delivery, off-site manufacturing
Chapters
["national"]
Temp Draft
Off
Updates
[{"updated_date":"2023-04-11T18:28:02+00:00","author_name":"Isabella Rosse","author_id":"2b343886-2619-4b5c-949c-10acf9b6ac00","action":"created"},{"updated_date":"2023-04-11T18:30:00+00:00","author_name":"Isabella Rosse","author_id":"2b343886-2619-4b5c-949c-10acf9b6ac00","action":null},{"updated_date":"2023-04-11T18:30:36+00:00","author_name":"Isabella Rosse","author_id":"2b343886-2619-4b5c-949c-10acf9b6ac00","action":null},{"updated_date":"2023-04-11T18:31:10+00:00","author_name":"Isabella Rosse","author_id":"2b343886-2619-4b5c-949c-10acf9b6ac00","action":"submit for approval"},{"updated-date":"2023-04-20T14:43:16+00:00","author-name":"Francesca Di Marco","author-id":"409a7eff-7985-44b0-9bb3-5ee71d67a6ae","action":"published"}]
Suppress Tile Description
Off
Register Button Text
Register
Ready to Publish
Off
Embargo Date
Expiration Date
Hide Ads
Off
Portfolios
Hero Text Properties
{"position":"high","color":"white","wrap":false}