LEWISTON HIGH SCHOOL AND CAREER TECHNICAL EDUCATION FACILITY

Submitted by aiaboise@gmail.com on Thu, 06/03/2021 - 20:17
Deleted
Off
Members Only
Off
Feature Type
Body
{"version":"0.3.0","atoms":[],"cards":[],"markups":[],"sections":[[1,"p",[[0,[],0," Lewiston\nHigh School consists of a two-building, 60-acre campus located on a bluff\noverlooking the Lewiston Valley. The $60 million, grades 9-12 facility includes\na 205,000 sq. ft., two-story main building and a 39,000 sq. ft., single-story\ncareer technical education building. The concrete masonry and steel structure\nfeatures over 50 classroom and lab spaces, dramatic two-story commons with sky\nbridge, connecting cafeteria, 1,000 seat performing arts center, library, and a\n2,000 seat gymnasium facility with two upper level auxiliary gyms with jogging\nbalconies. The adjacent career technical education building features 16\nadditional state-of-the-art classroom, lab, and shop spaces. Initial site\ndevelopment includes parking for over 700 cars, bus and parent drop-off areas,\ntennis courts, and grading and site preparation for other field sport venues."]]],[1,"p",[[0,[],0,"Construction\nof a new grade 9-12 High School Facility (204,000 square feet) and a separate\nCareer Technical Educational Facility (38,000 square feet) both facilities to\nbe constructed on the same site with complete site development and\nimprovements."]]]]}
Project Name
LEWISTON HIGH SCHOOL AND CAREER TECHNICAL EDUCATION FACILITY
Showcase Image Captions
[{"image_id":"6406254","caption":""},{"image_id":"6406255","caption":""},{"image_id":"6406256","caption":""}]
Tile Sizes
Use on Homepage
Off
SEO Keywords
project, high school, showcase
Temp Draft
Off
Updates
[{"updated_date":"2021-06-03T20:17:26+00:00","author_name":"Lynn Jeffers","author_id":"b89b8559-6248-456e-bb13-8585fdf7422a","action":"published"},{"updated-date":"2021-06-03T20:17:32+00:00","author-name":"Lynn Jeffers","author-id":"b89b8559-6248-456e-bb13-8585fdf7422a","action":"published"}]
Chapters
["ea5ab380-ba02-4fb2-bde3-e76de6ef23e0"]
Suppress Tile Description
Off
Project Description
{"version":"0.3.0","atoms":[],"cards":[],"markups":[],"sections":[[1,"p",[[0,[],0," $59,237,433"]]],[1,"p",[[0,[],0,"Start of\nConstruction: March 2018"]]],[1,"p",[[0,[],0,"Completion: August\n2020"]]],[1,"p",[[0,[],0,"LKV Architects, P.L.L.C."]]],[1,"p",[[0,[],0,"Amber Van Ocker, AIA,\nNCARB, Managing Partner"]]]]}
Ready to Publish
Off
Hide Ads
Off
Embargo Date