ARE Cooperative

Submitted by mary@aiaw.org on Thu, 11/07/2019 - 19:11
Start Date
End Date
Venue Name
At various Wisconsin locations.
Host
AIA Wisconsin and Kahler Slater
Overview
{"version":"0.3.0","atoms":[],"cards":[],"markups":[["b"],["a",["href","http:\/\/www.eventbrite.com\/o\/aia-milwaukee-10885753581","target","_new"]],["a",["href","http:\/\/www.eventbrite.com\/o\/aia-southwest-wisconsin-12789034938","target","_new"]],["a",["href","http:\/\/www.eventbrite.com\/o\/aia-northeast-wisconsin-12788970490","target","_new"]],["sup"]],"sections":[[1,"p",[[0,[],0,"This ARE guided study\ngroup will cover designated categories of content for the conversation to focus\non at each meeting."]]],[1,"p",[[0,[0],1,"Register:"]]],[1,"p",[[0,[1],1,"Milwaukee"]]],[1,"p",[[0,[2],1,"Madison"]]],[1,"p",[[0,[3],1,"Green\nBay"],[0,[],0," "]]],[1,"p",[[0,[0],1,"2 \u2013 Zoning and Site"]]],[1,"p",[[0,[],0,"Tuesday, November 19"]]],[1,"p",[[0,[],0,"\u00b7 Site\nsurveys, including topography, easements, setbacks, and rights-of-way."]]],[1,"p",[[0,[],0,"\u00b7 Zoning\nordinances and other local requirements."]]],[1,"p",[[0,[],0,"\u00b7 Reviewing\ngeotechnical, soil boring, and environmental impact reports."]]],[1,"p",[[0,[],0,"\u00b7 \n Analyzing owner\u2019s program with adjacency and bubble diagrams."]]],[1,"p",[[0,[0],1,"3 \u2013 Building Codes"]]],[1,"p",[[0,[],0,"Tuesday, December 10"]]],[1,"p",[[0,[],0,"\u00b7 Review\napplicability of and navigate model building codes and local amendments\nthereof."]]],[1,"p",[[0,[],0,"\u00b7 Review\nnational code standards related to accessibility, existing buildings and\nhistoric preservation."]]],[1,"p",[[0,[0],1,"4 \u2013 Construction\nMaterials"]]],[1,"p",[[0,[],0,"Tuesday, January 7"]]],[1,"p",[[0,[],0,"\u00b7 Review\nthe use of wood, steel and concrete as building materials."]]],[1,"p",[[0,[],0,"\u00b7 Discuss\nfinish materials, especially as they relate to code compliance."]]],[1,"p",[[0,[0],1,"5 \u2013 Building Systems"]]],[1,"p",[[0,[],0,"Tuesday, January 28"]]],[1,"p",[[0,[],0,"\u00b7 \nMechanical, electrical and plumbing systems and their applicability."]]],[1,"p",[[0,[],0,"\u00b7 \nStructural systems and their integration with code requirements and use of a\nbuilding."]]],[1,"p",[[0,[],0,"\u00b7 \nArchitectural coordination with and between all building systems."]]],[1,"p",[[0,[0],1,"6 \u2013 Project\nDocumentation"]]],[1,"p",[[0,[],0,"Tuesday, Feb 18"]]],[1,"p",[[0,[],0,"\u00b7 Review\nthe purpose and scope for all methods of documentation during all project\nphases from proposals to final completion."]]],[1,"p",[[0,[],0,"\u00b7 Includes\nnotes, drawings, project manual, construction changes, punch lists, submittals\nand field reports, plus much more."]]],[1,"p",[[0,[0],1,"7 \u2013 AIA Contracts"]]],[1,"p",[[0,[],0,"Tuesday, March 10"]]],[1,"p",[[0,[],0,"\u00b7 Identify\nand navigate the standard suite of AIA contracts."]]],[1,"p",[[0,[],0,"\u00b7 \nUnderstand the contractual connection between all parties within a project\ndelivery method."]]],[1,"p",[[0,[],0,"\u00b7 Discuss\ncontract lexicon."]]],[1,"p",[[0,[0],1,"8 \u2013 Project Management"]]],[1,"p",[[0,[],0,"Tuesday, March 31"]]],[1,"p",[[0,[],0,"\u00b7 Expand\non the unique role and responsibility of a project manager."]]],[1,"p",[[0,[],0,"\u00b7 Handling\ninternal resource management, external consultant coordination, project\nbudgeting \u0026 estimating, and quality control relative to the project\ndelivery method."]]],[1,"p",[[0,[],0,"\u00b7 \nReviewing and applying 3"],[0,[4],1,"rd"],[0,[],0," party reports and sustainability\ngoals to a project."]]],[1,"p",[[0,[0],1,"9 \u2013 Business Management"]]],[1,"p",[[0,[],0,"Tuesday, April 21"]]],[1,"p",[[0,[],0,"\u00b7 Expand\non the unique role and responsibility of a business owner or manager."]]],[1,"p",[[0,[],0,"\u00b7 \nUnderstanding legal, ethical, and insurance requirements of business ownership\nand their risks."]]],[1,"p",[[0,[],0,"\u00b7 \nEstablishing systems for legal protections in an architectural office."]]]]}
Registration
{"version":"0.3.0","atoms":[],"cards":[],"markups":[],"sections":[[1,"p",[[0,[],0,"Registration is required."]]]]}
Event Type
Description
This ARE guided study group will cover designated categories of content for the conversation to focus on at each meeting.

Tags

Members Only
Off
Deleted
Off
Tile Sizes
Use on Homepage
Off
SEO Keywords
ARE study group
Chapters
["4a21bd61-b97a-49fe-84cd-e314d1fddf1c","1e0067ea-a3f5-46e2-9d59-b3351826429f","f07faca6-1da4-4d86-b303-e6b420e4a492","6e8d4551-c9f0-4c2c-a558-f5d5136522b7","56f4b5eb-4d91-4d28-b1a8-af0564c66e88"]
Temp Draft
Off
Updates
[{"updated-date":"2019-11-07T19:11:52+00:00","author-name":"Mary Orella","author-id":"28B885E0-B2EA-4F1A-80B3-DBA264CC3504","action":"created","author-search":"mary orella"},{"updated-date":"2019-11-07T19:11:59+00:00","author-name":"Mary Orella","author-id":"28B885E0-B2EA-4F1A-80B3-DBA264CC3504","action":"published","author-search":"mary orella"},{"updated-date":"2019-11-07T19:12:09+00:00","author-name":"Mary Orella","author-id":"28B885E0-B2EA-4F1A-80B3-DBA264CC3504","action":"published"}]
Suppress Tile Description
Off
Ready to Publish
Off
Expiration Date
Hide Ads
Off
User Needs
Portfolios